Caso de estudio. Viernes Negro

Archivos
Fecha
2011-07-06
Director de tesis/Asesor
Título de la revista
ISSN de la revista
Título del volumen
Publicador
Universidad Icesi
Editor
Compartir
Resumen
Abstract
The objective of the case discussed here is to present the complex situation that arises at a large raw material manufacturing company in the construction industry when its integrated information management system collapses; a situation commonly known as “a system crash”. These kinds of system failures constrain logistical activities related to the distribution center that is responsible for shipping orders on a national level on the sales closing date at the end of a given month. This hampers the order invoicing process and, therefore, gives rise to non-compliance with order deliveries, customer dissatisfaction, potential loss of orders, and non-compliance with the company’s sales goals, thus affecting the profitability.
Resumo
Descripción
El siguiente caso tiene como objetivo presentar la situación compleja que se genera en una gran empresa manufacturera de materia prima para el sector de la construcción, cuando el sistema integrado de información que dispone Sufre un colapso (o "se cae el sistema", como se denomina comúnmente) en la fecha de cierre. Esta falla genera un constreñimiento en las actividades logísticas relacionadas con el centro de distribución, unidad que despacha los pedidos a nivel nacional; impidiendo la facturación de pedidos y, por consiguiente, generando incumplimiento en las entregas, insatisfacción del cliente y posible pérdida de pedidos y no cumplimiento de la cuota de ventas de la empresa afectando los estados de resultados.
Palabras clave
Gestión del riesgo, Continuidad del negocio, Infraestructura tecnológica, Risk management,
Keywords
Continuity management, Availability management, Ingeniería de producción, Production engineering
Palavras-chave
Citación
Handle
ISBN
ISSN
01235923