Activity scheduling for Cost-Time investment optimization in project management

No hay miniatura disponible

Fecha

2008-05-17

Director de tesis/Asesor

Título de la revista

ISSN de la revista

Título del volumen

Publicador

Editor

Compartir

Resumen

The Cost-Time Profile is a tool that presents the combined impact of disbursements made during the execution of a project, and their timing. The Cost-Time Profile chart presents the accumulated cost at any given time, and the area under the curve is the Cost-Time Investment. This Cost-Time Investment has a quantifiable impact on the working capital the company uses, and it is also useful for the determination of the Direct Cost of a product. This paper aims to develop a model to create the schedule of activities that minimizes the Cost-Time Investment for a project.

Abstract

Resumo

Descripción

Palabras clave

Ingeniería de producción, Costo-beneficio, Inversión, Modelos de inversión

Keywords

Production engineering,

Palavras-chave

Citación

DOI

Handle

ISBN

ISSN

OLIB

URL

YouTube

Creative Commons License
Excepto si se señala otra cosa, la licencia del ítem se describe como Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0).